Building summary

Project status
LocationBibliotheksstraße 1, 28359 Bremen, Bremen
Year of construction1973
Refurbished2004
Building ownerStaats- und Universitätsbibliothek Bremen (+ Betreiber, Nutzer)
InvestorZukunftsinvestitionsprogramm (ZIP)
Gross floor area27.429 m2
Heated net floor area25.011 m2
Gross volume118.972 m3
Main usable floor area20.794 m2
A/V ratio before refurbishment0,19 m2/m3
A/V ratio after refurbishment0,19 m2/m3
Key aspects

Project description

Alongside the reference areas, the library from the year 1975 also has administration rooms, workshops, and a lecture theatre. In accordance with the concept of convenience and thermal comfort prevalent at that time, all areas in the building are automatically air-conditioned. Also typical of the time of construction is the facade with fixed glazing. The floor plan is of an almost square design, developed over 5 storeys. The generous reference area inevitably entails large deep rooms. This makes the building also very compact. The building structure is a reinforced concrete skeleton construction with a curtain wall facade. The intricate vertical subdivision of this facade is seen by the university as a distinctive design feature; therefore, it was requested that this be retained in the refurbishment. All measures had to be implemented during ongoing use of the building.

Refurbishment concept

The university's very high energy costs called for significant energy savings. The intention was to save over 50% of the original primary energy requirement. Also, library users complained repeatedly about the interior climate, unbalanced lighting, unopenable windows, the lack of possibilities to make adjustments, and permanent noise emission from the air conditioning and ventilation system. The refurbishment would also have to solve these problems. For the contractor, it was important to ensure a pleasant interior climate all year round, despite  reduced air conditioning equipment. Alongside the energy-oriented refurbishment, the entrance area was to be redesigned, and the interior decoration, as well as the technical and IT equipment in the work areas, was to be modernised. In the administration rooms, openable windows were installed. The neutral solar protection glass (g=0.38), used in combination with the existing sun protection elements, guarantees thermal insulation in summer. The thermal insulation of the roof surfaces was improved.

Energy concept

Demand-oriented (and thus energy-saving) control of heating, cooling and ventilation of different areas was not possible with the old air conditioning and ventilation system. During the refurbishment, the original air only system was dismantled, and replaced by three separately controllable systems for heating, ventilation and cooling. Rooms with exterior walls are now ventilated naturally. A small, controllable air conditioning system with enthalpy recovery ensures that air renewal in rooms with no exterior walls reaches the minimum level. Water is the medium now used to transport energy for heating and cooling. In the glass facade areas, conventional radiators were retrofitted, so the window fan system could be abandoned. At night and on weekends, the air conditioning systems can be almost completely switched off. The higher thermal loads arising in the building's interior are now compensated for by room cooling devices, for which the required cold water is partly provided via free cooling. The waste heat is simultaneously used for preheating of outdoor air via heat exchangers. Despite significantly increased light levels, the connected load of the lighting system was reduced by approximately 40% due to more efficient technology. The building's thermal insulation was significantly improved by replacement of the glazing, and insulation of the roof.

Performance

Experience gathered in the first year of operation after the refurbishment shows that the primary energy consumption was reduced from 831 kWh/m² p.a. in 2002 to 230 kWh/m² p.a., i.e. by around 70%. An accompanying socio-scientific user survey attested to a significantly higher level of user satisfaction than before the refurbishment.

Optimisation measures and possibilities

Due to initiated measures for optimisation of operations, even higher total energy savings are expected for the second year of operation (2006). Evaluation and optimisation will be completed by the middle of 2007.

Construction costs and profitability

The energy-oriented refurbishment cost 7.24 million euros. Much of this was financed by the German federal government's Investment in the Future Programme (ZIP). For the university's own share of the cost, there was initially no investment capital available in the budget. After detailed examination, the contractor rejected the idea of enabling complete financing by means of a performance contracting agreement. Instead, a municipal loan was arranged, to be paid off by means of the reduced burden on the budget which the energy cost reductions entail. Thus, the university itself took on the role of contractor, including the risks, but also the financial opportunities of such a procedure ("intracting"). As yet, due to the fact that the predicted savings were even exceeded, and that energy prices are higher than calculated, this is working out very we

Key energy data

Energy indices according to German regulation EnEV (in kWh/m2a)before refurbishmentafter refurbishment
Heating energy demand85,00
Overall primary energy requirement329,00
Measured energy consumption data (in kWh/m2a)before refurbishmentafter refurbishment
Thermal heat consumption259,0047,00
Total source energy831,00250,00
Power for lighting35,00
Power for air conditioning plant33,00
Heat for room heating areas34,00
Heat for air conditioning plant13,00
Cooling7,00

Refurbishment costs

Refurbishment costs in €/m2
Overall costs467
Energy recovery refurbishment of the building construction69
Energy recovery refurbishment engineering171
Modernisation, equipment226

These figures represent established costs, Related to gross floor area

Operating costs

(Data according to main usable floor area)

Operating costs in €/m2abefore refurbishmentafter refurbishment
Total energy costs23,757,70
Heating7,101,28
Total electricity consumption13,386,01
Lighting3,862,42
Infiltration/ventilation/cooling11,152,64

Additional information:

Accompanying research, evaluation
Hochschule Bremerhaven Studiengang Versorgungstechnik und Anlagenbetriebstechnik
Scientific advices
Schiller engineering
Evaluation
ttz Bremerhaven
General design, sectoral planning building services engineering
RCI GmbH
Architecture
HJW+Partner Architekten und Ingenieure
  • The picture shows the building in a thermography before the refurbishment.
  • The picture shows the lighting situation before the refurbishment.
  • Interior view with lighting.
  • The new facade of the Bremen State and University Library.
  • The new lighting concept performs very efficient. The stock of books is lighted much better.
  • The refurbished University Library.