Main content:

Glaser FMB GmbH & Co.KG

Address data
Postal addressAm Kapellenberg 53, 37688 Beverungen
Phone+49(0)5273 / 6257
E-mail

s.glaser-fmb(at)t-online.de

CategoryServices
Profileflat glassware, production techniques, project management, research projects, vacuum glass

Player in the projects below:

In the foreground: Two models of vacuum insulation glass on the fair glastec06 in Düsseldorf, Germany
Technology status: Phase 2
Framework project ViBau

Next Step: Vacuum insulation glass

Vacuum instead of inert gases - with this technological development, glazing could take another great developmental stride. However, at 10 tonnes per square metre, the atmospheric pressure on evacuated flat glazing is immense. And for evacuated glazing, the same applies as for vacuum panels: only a lasting vacuum guarantees good thermal insulation. Now, this research project is to provide evidence that evacuated glazings with special functional layers are technically feasible for architecture.

Profil of a new, thermal optimized frame structure.
Technology status: Phase 2
Framework project ViBau

Thinner heat insulation with new window and facade constructions

The heat insulation requirements on buildings will only continue to be tightened. For exterior walls with heat insulation, this is basically not a problem. But for windows and facades it is conceivable that in a few years the requirements will only be met with triple-glazing or with vacuum-glazing which may be available by then. A research project will now develop particularly low thermal bridging constructions for the integration of extremely good thermal insulating and vacuum glazing for thin framework and facade structures.


Additional information: